Petchem Gas Solution
Private Limited
Petchem Gas Solutions Pvt Ltd
Petchem Gas Solutions Pvt Ltd
Petchem Gas Solution
Private Limited
Oil & Gas Sector
Trainings
PNGRB Regulations
T4S for NGPL, CGD and PPPL
IMS for NGPL, CGD and PPPL
ERDMP for NGPL, CGD. PPPL, LPG Bottling
Capacity Assessment
Simulation – Transition Analysis
Tariff Regulations
Design of Natural Gas Pipeline
Project Appraisal
Hydrocarbon Truck Loading Gantry /Rail Loading Gantry
Standard Operating Procedure
Compressors, Controller and Its Operation Gas Turbines, Steam Turbines
Cooling Tower Operation and Its Treatment
Interlocks of plant and Equipment
Project Planning and its Appraisal
Certificate for Training
Third Party Inspection (TPI)
T4S, IMS and ERDMP
External Safety Audit (ESA)
Internal Piping to Industrial Customers
LPG Storage
( Horton, Mounded & Bullets)
Pre-Start up Safety Report
Pre-commissioning Safety Audit
Gradeability Test for Pay loaders
Certification for Audits
Energy Audit
Technical Study
Adequacy Checking
Technical Due Diligence of CGD, Last Mile Connectivity
Preservation Study Report
Simulation Study
Capacity Assessment
Pre-Feasibility Study
Feasibility Study of NGPL, CGD, etc.
Review of Design Basis
Optimization Study
Pipeline Survey
Geo-Topical Survey
Pre-commissioning / Commissioning Activities
NG Pipeline & Local pipeline network,
Internal Connectivity for Industrial ,
City Gas Distribution
Natural Gas Processing Unit
LPG Plants
CNG Stations /LNG / LCNG Stations
Petrochemical Plants /Polymer Plants
Boilers
Cooling Towers
Rotating Equipment
Gas Turbine /Steam Turbine//centrifugal
Compressors /Expanders
Horton Sphere and LPG Mounded Storage
Bullets
Pumps/ Blowers/Reactors,